Penetration sealing, curtain wall firestop, head-of-wall and expansion joints — installed to approved system details and handed over with the documentation Civil Defence and your consultant will ask for.
Send the drawing or penetration schedule and we will come back with a priced scope — usually within one working day.
Thank you — our estimation team will come back to you shortly. For anything urgent, call +974 7053 6538.
Cable trays, conduits, pipes and busbars through rated walls and slabs.
Slab-edge barriers and safing, sequenced with the cladding contractor.
Top-of-wall deflection joints that hold the rating and allow movement.
Floor, wall and ceiling movement joints with tested joint systems.
Board, mortar and pillow systems for congested shafts and transits.
Damper-to-wall and damper-to-slab interfaces that pass inspection.
Claims get rejected not because the material was wrong, but because nobody can prove which listed system was used where. We build that record as the work proceeds — and we take it on as a standalone scope if your firestop is already installed.
Ask about documentation supportPenetration schedule or MEP drawings — we identify conditions and ratings.
Rates per condition with the system reference against each one.
Materials, method statement and details issued before we mobilise.
Own crews to your floor release, then the labelled, documented handover file.
Send it across and we will return a priced scope with the system reference against each condition — normally within one working day.
WhatsApp us